Florida-based · Informatica exit · Azure integration · AI-accelerated delivery
Your PowerCenter estate is out of support. We move it.
DataCode is a Florida-based data integration practice. Our founders have led enterprise PowerCenter-to-IDMC migrations end to end — not scoped them, not overseen them — and a senior engineer leads every engagement we take. We put AI to work reading and converting the estate, ship every artifact through versioned pipelines, and prove each migrated pipeline produces the same rows as the one it replaced. Then we keep it running.
The support clock
November 2025
Salesforce completes its acquisition of Informatica
March 2026
PowerCenter 10.5.x leaves standard support
March 2027
Paid extended support ends
2029
Sustaining support ends — no guaranteed fixes for critical defects
Confirm current dates with Informatica before relying on them for a budget cycle.
- enterprise Informatica-to-cloud migration programmes led
- 3enterprise Informatica-to-cloud migration programmes led
- years in enterprise data integration and architecture
- 18+years in enterprise data integration and architecture
- lower integration run-rate than the Informatica licence it replaced — funding three full environments the licence never covered
- ~58%lower integration run-rate than the Informatica licence it replaced — funding three full environments the licence never covered
- production integration workflows now running on Azure, replacing a licensed Informatica estate (measured August 2026)
- 250+production integration workflows now running on Azure, replacing a licensed Informatica estate (measured August 2026)
Why we exist
The two things an Informatica exit needs are almost never in the same person.
It needs someone who has actually led one — not scoped it, not overseen it — and it needs a delivery practice that uses AI properly rather than as a line in a proposal. The engineers with twenty years of enterprise integration behind them are mostly not working this way. The people fluent in AI-assisted delivery have mostly never opened a PowerCenter mapping. DataCode was founded to put both in one team, and to train consultants into the combination so the capability is reproducible rather than sitting in two heads.
Depth in the estate you are leaving
Not cloud-native experience with a PowerCenter chapter bolted on. Two decades inside these estates — the mapplets nobody documented, the control numbers the translator issues, the scheduler dependencies that only surface at cutover. That is the knowledge that decides whether a migration lands, and it is leaving the market faster than the platform is.
AI used where it is unambiguously good
Reading an undocumented estate at volume is the thing AI is genuinely excellent at, and it is where the acceleration is real. Deciding what the output means is not, and we do not pretend otherwise. We publish no automation percentage, because we have not measured yours and neither has anyone quoting you one.
Built to be reproducible, not heroic
A two-person firm that cannot grow is a bottleneck a client discovers in month three. The method is written down — instruction files, agent skills, review gates, parity tests — so a consultant can be trained into it and a founder can check they have been. That is the whole company: a standard, written down, with the people who set it still checking it.
The clock is not ours. It is the vendor’s.
PowerCenter 10.5.x left standard support in March 2026. Extended support runs to March 2027 and sustaining support to 2029, with no guarantee of fixes for critical defects. Informatica is now part of Salesforce, and licensing is moving to consumption-based metering. Every quarter spent deciding is a quarter of extended-support cost and a quarter less runway.
The converter does not finish the job
Nobody can prove the new pipeline is right
The knowledge left the building years ago
What we do
Six engagements. Most clients start with the first one, because it is the one that tells you whether the rest are worth buying.
Fixed fee · 3 weeks
Informatica Exit Assessment
Fixed fee per wave, or time and materials
PowerCenter → IDMC Conversion
Programme
Informatica → Azure Integration Modernization
Programme
Cloud Data Platform & Lakehouse
Fixed fee · 3–6 weeks
AI-Assisted Delivery Enablement
Monthly retainer · US business hours
Managed Run & Automated Production Support
Hourly · direct or through your integrator
Senior Engineering Capacity
Where this experience comes from
Enterprises whose data platforms our principals have built, migrated or run. Named because the work is on the record, not because a logo looks good on a page.
- Toyota North America
- Intertape Polymer Group
- F&G Annuities & Life
- CoreLogic
- Practice Fusion / Allscripts
- Gavilon
- Defense Health Agency
- ADT / Tyco
- Genuine Parts Company
- Nestlé Dreyer’s
- PG&E
- Sabre
- Danaher
- Medtronic
- Canada Life
- Accenture
Industries delivered in
- Insurance & annuities
- Automotive distribution
- Healthcare & EHR
- Mortgage finance
- Commodity trading
- Manufacturing & packaging
- Defense health
- Consumer goods
Start with the assessment.
Three weeks, fixed fee, and you finish it knowing what your estate contains, what it costs to move, and what it costs to stay. Credited against the migration if you award it.